fbpx

GATEWAY STUDIOS CONSTRUCTION UPDATE

September 19, 2023 GatewayAdmin

FALL 2023 GATEWAY STUDIOS CONSTRUCTION UPDATE

This post originally appeared on Gateway’s Instagram

As Gateway Studios’ development continues, we are excited to share the latest progress update with you 🏗️

Crews are now building tilt panel forms in preparation for concrete that will become the east loading dock walls of Studio 80 and Studio Support. Inside Studio 80, electricians have run permanent conduit that will power our clients productions.

All meanwhile, another crew is pouring concrete into what will be the finished floor in Studio Support Space! Over at Studio 75, the final concrete tilt panels are placed.

Find out more about Gateway Studios at gsps.com/studios

LET'S WORK TOGETHER

PRODUCTION EXCELLENCE

3615 Tree Court Industrial Blvd
St. Louis, MO
63122

info@gsps.com

855-332-4777 (GSPS)

    © 2022 GATEWAY STUDIOS & PRODUCTION SERVICES
    contact-section